Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Oct 18, 2021     11-3 Empennage attach step 1-12 - (5 hours)       Category: Tail Feathers
After mounting the elevators in trail position we used the bushing to match drill the horns through the VA-146 Elevator Center bearing. After that we removed the two elevators and final drilled the holes for an AN4 bolt using a #12 drill.
We reinstalled both elevators and secured both in trail position again.
We identified the most aft horn and removed again the elevators. In our case there was a minimal mismatch, with the right horn slightly back compared to the left. We defined the position of the pilot hole on the right elevator and we proceeded with the drilling of the horn.
After that we prepared a guide block using wood and two aluminium strips secured with pull rivets and we drilled the guide hole.
We drilled with 3/16" and after that with #12 drill for a AN3 bolt.
End result is very satisfactory and Lucio's support has been very valuable as always....avoiding the mess i could have done.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.